Rossland Lumber brought us a 40′ shipping container to modify the framework to allow for 3 roll-up doors along the side. We stuffed it into our shop and reinforced the structure before cutting the openings and finally adding the door brackets. After a couple coats of bright red paint we installed the doors and shipped it off for service.